Project Overview

Type: Commercial Net-Metered

Location: South Frontenac

Project: 40kW Net-Metered

  • Commercial
  • Net Metered

Installation Details

The newly built South Frontenac Fire Station was looking for ways to reduce energy costs and be more green. After construction, we were able to install 88, 455W Panels on the roof top, which faces almost perfectly south. With this orientation and roof pitch, this system is able to offset 48,000kWh of usage in the firehall every year!

Other Case Studies