Project Overview

Type: Commercial FIT

Location: Westport

Project: 600 kW grid connected system

Installation Details

Summary

This ground mounted FIT project took 3 years for the planning stage to be completed. The customer required a turn key installation of the system. The mixed terrain presented many challenges in getting this system installed in a timely manner.

What was installed

Terrafix ground rack, Panasonic 72 cell modules, Kaco 600 VAC string inverters.

Results

The Sunnyside Power Companies 600kW DC system was connected in November of 2013, and is profitably operating with minimal down time.